No.CameraHeight and axisProject questionDecision answered
01Wide elevated interior cameraRaised / full floor
How do equipment zones, reception and primary aisles work together?
Layout coordination, capacity reading and overall zoning clarity.
02Eye-level reception and route cameraStanding height / arrival
How does a member move from reception into training and recovery?
Arrival sequence, desk position, wayfinding and first-impression materials.
03Low floor-level training cameraNear floor / lane axis
Do sled lanes, strength edges and athlete movement remain clear under load?
Operational density, safe clearance and training atmosphere for marketing.
04Recovery and hospitality cameraSitting to standing / lounge
Do lighting, finishes and seating communicate the intended brand quality?
Material selection, lighting mood and hospitality adjacency decisions.
05Fixed conversion comparison cameraMatched existing and proposed pair
What changes between the retained shell and the proposed fit-out?
Conversion scope, retained structure and the tested intervention package.